Full Home Remodeling in Burbank
A Burbank whole-house remodel starts with plans approved by the city building department, then rough, framing, insulation and final inspections in order.
Approval from the City of Burbank's building department has to be in hand before a whole-house remodel there opens a wall. The plan checker reading the set looks at structure, systems and exits: which walls carry load and what replaces them, where new circuits and gas lines run, and whether every new bedroom has a window a person can climb out of. Inspectors then visit as the work moves along, and each visit has to pass before the next layer covers it.
What the set has to show
The drawings show existing and new walls, any beam with its posts and footings, and the engineer's calculations where load moves. Electrical sheets list the panel size and new circuits. Plumbing and gas sheets show fixture locations and pipe sizes. Energy compliance forms cover new windows, insulation and any replaced heating or cooling equipment. Each required location for a smoke or carbon monoxide alarm is drawn as well, since an alteration of this size brings those alarms up to current rules. A complete set moves through review with fewer questions.
Inspections in the right order
Inspections follow the work as it happens. Footings for a new post are inspected before concrete is placed. Rough plumbing, gas, electrical and mechanical work are each inspected while the walls are open, and the framing inspection is signed after those are approved, since the inspector needs to see every hole drilled and notch cut for them. Insulation is inspected next, then drywall fastening where the city calls for it, and a final inspection closes the permit once fixtures, alarms and appliances are working.
Full Home Remodeling in Burbank: questions to settle first
The house is opened and framing changes are built first. Rough plumbing and gas, then wiring and ducts, start with the kitchen's runs and pass inspection before the frame is signed off. Insulation, board and tape follow. Cabinets, counters, floors, trim and paint close the house, with fixtures and appliances connected for the final visit.
It can, after we learn what rests on it. Load from the ceiling or roof moves to a new beam, with posts carrying it down to footings, and the calculations go to the City of Burbank building department for approval before any stud is cut. A partition holding only wiring, pipes or a duct is cleared of them first. A small inspection hole settles which case applies.
The items the plan checker reads: wall changes, beam locations, window sizes, the kitchen layout, the appliance list, fixture positions and panel capacity. Revising any of those after approval sends the set back for another look, which pauses the work. Finishes such as tile, paint and hardware stay open until later.
Full Home Remodeling in other cities
More work we plan in Burbank
Start your full home remodeling plan in Burbank
Describe the space and the change you want. We reply with what the first visit covers.

