Bathroom Remodels Planned From the Drain Up

A bathroom layout is fixed by its drains. We decide whether the toilet, shower and vanity stay or move, then plan waterproofing and tile around that.

Tell us about the kitchen

By sending, you agree Navon Home may contact you by call or email about your request. Consent isn't required to buy. Privacy Policy

Where the drains go

Moving a toilet or a shower drain means cutting the floor or the slab and rerouting the vent. Keeping them in place saves money and time. We draw both options when a move would help the room and price each in writing.

Waterproofing before tile

Tile is not waterproof on its own. Behind every shower we build a membrane system with a sloped pan and sealed seams, and we test it before tile goes on. That layer decides how long the shower lasts.

Venting, light and finishes

An exhaust fan ducted to the outside, a lit vanity and enough outlets are planned with the layout. Then tile, fixtures, glass and cabinets are chosen to fit the drawn room.

Bathroom Remodeling: questions

Planning a new bathroom?

Give us the room size and the changes you want. You hear back about a visit and a written quote.