ADU Construction in Pasadena, Roof and Kitchen Planned Together
Pasadena ADUs with roofs drained away from both buildings, ember-ready details where the parcel is mapped, and a kitchen placed around the roof lines.
Gutter placement on a Pasadena ADU comes before the kitchen layout. A shed roof sheds to one gutter line, so the downspouts end up on a single side, away from the neighbor and the main house. That choice fixes which wall can carry the hood duct and the plumbing vent, and the galley follows from it. Drainage across the yard is drawn at the same sitting.
Gutters, downspouts and the yard
Water off a pitched roof collects in a gutter whose size we work out from the roof area, then drops through downspouts into closed pipe or onto splash pads aimed at planting or the street, never at either foundation. If the yard has little fall, a dry well or a dispersion trench can hold runoff on site, and the City of Pasadena reviews that with the drainage notes. On a low-slope design, a single-ply membrane is laid to falls so nothing ponds near the edge, with a scupper and leader head at the low corner.
Ember-ready details where mapped
Whether your parcel falls on Pasadena's mapped fire hazard areas is a lookup we do at the start, since parts of the city are mapped that way, which can bring ember-resistance rules to a lot. If it does, the roof covering is Class A, vents get fine metal mesh, eaves are enclosed and the siding is noncombustible. Gutters can take a cover so leaves do not collect in them. Windows get tempered glass in at least one pane. The kitchen hood's exterior cap gets a damper and screen that close tight.
ADU Construction in Pasadena: questions to settle first
A galley along one wall suits a studio, holding a sink, a 24-inch range, an apartment fridge and about 8 feet of counter. A one-bedroom unit can fit a full-depth L with a dishwasher and a pantry cabinet. We draw both options at scale on the Pasadena footprint you have, then size the circuits for whichever appliances you pick.
Pasadena plan check spends its questions on the site plan and on the roof and drainage details, and on a mapped fire hazard parcel the exterior notes join them. We prepare the full permit set, file it with the City of Pasadena and reply to each correction.
The house lateral is the usual sewer tie-in, reached with a new cleanout where the unit's line joins it. Water branches off the main supply with a separate shutoff. Power comes through a buried conduit from the house panel to a subpanel in the unit, or from a separate service if the load calculation calls for one.
ADU Construction in other cities
More work we plan in Pasadena
Start your adu construction plan in Pasadena
Describe the space and the change you want. We reply with what the first visit covers.

