ADU Construction in Altadena for County Review

Altadena ADU construction drawn for Los Angeles County review, with ember-resistant details on a mapped lot and a kitchen a plan checker can read.

Tell us about the kitchen

By sending, you agree Navon Home may contact you by call or email about your request. Consent isn't required to buy. Privacy Policy

Mapped fire hazard status is the first line a Los Angeles County reviewer checks on an Altadena ADU application, since some Altadena addresses fall inside those areas and others do not. The permit itself comes from Los Angeles County Public Works. After that check, the reviewer turns to room sizes and egress, and we label the kitchen clearly on paper, with appliance widths, the hood duct and the sink wall all labeled.

How the county reads the outside of the unit

A county reviewer reads the shell of an Altadena unit on a mapped parcel as a fire barrier, starting overhead and working down. The roof has to be Class A rated, the eaves closed or screened with fine mesh, the cladding able to resist a burning brand, and every window glazed with a tempered pane. Gutters need covers, and an attached deck has to meet the same standard. The county fire department may also review access and hydrant distance. Engineered footings and a soils report join the set when the parcel slopes.

A kitchen ready for plan check

We draw the kitchen of an Altadena unit so a plan checker can follow it without guessing. Appliance widths are labeled, the hood shows its duct path to an exterior wall cap, and the receptacle layout matches the small-appliance circuits on the load calculation. If the unit is all electric, the panel schedule shows the induction range and the heat pump water heater. If gas is planned, the meter location and pipe sizing appear on the plumbing sheet. Clear labels leave fewer comments to answer.

About adu constructionRemodeling in Altadena

ADU Construction in Altadena: questions to settle first

Start your adu construction plan in Altadena

Describe the space and the change you want. We reply with what the first visit covers.