Structural Work in Valley Village

Valley Village wall removals start with the kitchen layout, then engineering and LADBS plan check, before demolition, footings, beam and ceiling repairs.

Tell us about the kitchen

By sending, you agree Navon Home may contact you by call or email about your request. Consent isn't required to buy. Privacy Policy

Settling the kitchen layout comes ahead of the engineer and the permit on a Valley Village wall removal, because the opening has to line up with the island, the range and the hood. With the layout fixed, the engineer sizes the beam and posts, LADBS reviews the set, and the wall comes out only after the permit is issued. Finishes are chosen once the new ceiling is closed.

Layout, engineering and review

We draw the kitchen with the wall gone and mark where a post could stand without blocking a walkway or a cabinet run. The engineer then checks the framing above, sizes a beam to carry it and locates a footing under each post. Plan check happens at LADBS, the City of Los Angeles department with authority over Valley Village. Comments come back on the sheets and are answered with revisions, and the permit is issued once the reviewer can follow the load to the ground.

Opening the wall and closing it again

Plastic sheeting, zip doors and floor protection go in before demolition. Temporary supports hold the ceiling while the wall is removed and any wiring or plumbing inside it is rerouted. New footings are dug, inspected and poured, then the posts and beam are installed with the hardware listed on the plans. Once the framing inspection passes, the kitchen lighting circuits and the hood duct go into the open ceiling, drywall closes it, and paint and flooring repairs finish the room.

About structural workRemodeling in Valley Village

Structural Work in Valley Village: questions to settle first

Structural Work in other cities

Start your structural work plan in Valley Village

Describe the space and the change you want. We reply with what the first visit covers.