Arleta ADUs placed where the house sewer lets kitchen and bath drains fall by gravity, with a short plumbing wall and LADBS plan check and inspection.
Tracing the house sewer to the street comes before we stake an Arleta ADU, since the pipe's route and depth mark out where a backyard unit can drain by gravity. A spot whose kitchen and bath can fall steadily to that line keeps the plumbing simple. Where the fall comes up short, a pump basin can lift waste to it, at the cost of a part that needs power and upkeep.
What the camera tells us
A camera run shows cracks, roots, sags and the pipe material, and each one bears on whether the unit can share the line. A sound lateral with enough depth takes the new branch through a wye fitting, with a cleanout near the tie-in. A damaged one may need lining or replacement out to the street, which is quoted as a separate item. We also confirm the pipe size can carry the added fixtures, and we keep the new footing clear of the lateral's path so neither one loads the other.
Kitchen and bath on the drain side
Sink and bath back onto a single plumbing wall placed toward the tie-in, so the drain under the slab runs short and straight. The water branch can share part of the trench where the plumbing code's separation rules are met. The city's all-electric rule for new buildings covers a detached ADU here, so a load study at the house panel shows whether a subpanel can draw from the existing service or whether a second meter is needed. LADBS inspects the open trench before it is backfilled.
ADU Construction in Arleta: questions to settle first
Counter length in an Arleta studio allows a straight kitchen with sink, induction cooktop, oven and fridge. A one-bedroom plan can wrap into an L big enough for a dishwasher. The sink goes where its drain makes a short trip to the lateral, and the layout is drawn to scale.
An Arleta ADU set goes to LADBS with the sewer route drawn on the site plan and the pipe sizes and tie-in detailed on the plumbing sheet, the pages plan check reads hardest for this layout. Our office prepares the remaining sheets, files the set and answers each correction.
Sewage reaches the house lateral by gravity where depth allows, or through a pump basin where it does not. Water branches from the house supply and gets its own shutoff valve. A buried line carries power out from the house panel, and a load study that comes up short points to a separate meter.