ADU Construction in Rolling Hills, Runoff and Drains Settled

Rolling Hills ADUs drawn with roof runoff and the wastewater connection settled for review, around a pantry kitchen planned on a single plumbing wall.

Tell us about the kitchen

By sending, you agree Navon Home may contact you by call or email about your request. Consent isn't required to buy. Privacy Policy

New roof and new paving both stop rain from soaking into the ground, so a reviewer at the building department serving Rolling Hills asks where that water will go before approving an ADU. We answer on the site plan with gutters, downspouts and a dispersal area set clear of the footings and the property lines. The kitchen follows, drawn so its sink and dishwasher drain toward whatever wastewater connection the lot actually has.

Wastewater, confirmed on the ground

Before the unit is placed, we confirm how the main house disposes of wastewater, from the records and from what we find in the ground. If the house drains to a public sewer, the new line has to fall toward that connection with enough slope along its whole length. If it drains to a private septic system, the tank and its dispersal field become ground the unit must stay clear of, and the capacity of that system for added flow gets its own review. In both cases one plumbing wall serves kitchen and bath, so a single line leaves the unit.

A kitchen framed by pantry cabinets

A full-height pantry cabinet at each end of the counter gives a small Rolling Hills unit storage a closet would otherwise hold. Between them go the sink under a window, a 36-inch range under a hood ducted outdoors, and a dishwasher beside the sink so the two share a drain. The counter runs unbroken, leaving room for a cutting board and a mixing bowl side by side. Water-saving faucets and a compact dishwasher keep the daily flow modest, which matters on any lot where wastewater capacity is part of the review.

About adu constructionRemodeling in Rolling Hills

ADU Construction in Rolling Hills: questions to settle first

Start your adu construction plan in Rolling Hills

Describe the space and the change you want. We reply with what the first visit covers.