Bel Air Kitchen Remodeling Starts at the Toe-Kick

Bel Air kitchen remodels begin low and wide: toe-kick openings, subfloor and shutoff checks, then full-room measuring before a quote is written.

Tell us about the kitchen

By sending, you agree Navon Home may contact you by call or email about your request. Consent isn't required to buy. Privacy Policy

A toe-kick comes off before a price is written in a Bel Air kitchen, because the base of the cabinets shows what the floor is made of and where the lines run. A flashlight at that gap tells more about the plumbing, the subfloor and the wiring than the upper half of the room does. The tape measure gets its turn right after.

Looking low

The toe-kick gap exposes the floor surface, the subfloor edge and often the pipes and cables heading up into the cabinet bases. The cabinet under the sink is emptied to show the drain material, the shutoff valves and any staining. Floor registers, if there are any, reveal the joist direction. The gas shutoff and the main water valve are located and tested for freedom to turn, because a valve that seizes is better found now than during demolition. Notes and photos from the low look go into the file for the drawing stage.

Measuring the whole room

The tape records every wall length, the position of each window and door, and the ceiling height at several points. Diagonals show whether the room is square, which matters for how cabinet runs meet. If the room is large, long runs get special attention: the farther a sink, range or island sits from existing lines, the more floor and ceiling the plan opens. The numbers go into a drawing that tests the layout before the quote does, and any dimension that looks off gets measured a second time.

About kitchen remodelingRemodeling in Bel Air

Kitchen Remodeling in Bel Air: questions to settle first

Start your kitchen remodeling plan in Bel Air

Describe the space and the change you want. We reply with what the first visit covers.