Full Home Remodeling in Tarzana

A Tarzana whole-house remodel begun at the table: a wall plan, an appliance list and a shutoff map agreed before any drywall comes off.

Tell us about the kitchen

By sending, you agree Navon Home may contact you by call or email about your request. Consent isn't required to buy. Privacy Policy

The first job on a Tarzana whole-house remodel happens at a table: a wall plan, an appliance list and a map of every shutoff, agreed before any drywall comes off. The order of work begins there. With the kitchen's needs on paper, each later trade knows what is already in the walls and what to leave alone.

Paper before dust

The wall plan marks which walls move, which stay and which are tested for load. The appliance list fixes the size of gas lines, exhaust ducts and circuits. The shutoff map shows how to isolate water, gas and power room by room. Once all of them exist, the schedule can be built backward from the final inspection. Material orders follow from the same set, so cabinets, fixtures and flooring arrive when the house can receive them. Changes after that point are possible, and each one is traced back to the paper first.

Protection, then demolition

Protection comes before demolition itself. Floors that stay are covered, doorways that open to living areas get dust barriers, and the heating and cooling returns are sealed so dust does not circulate. Demolition then runs back from the kitchen, with the first cuts at the walls the plan says will move. Debris leaves by a designated door to keep the rest of the house clean. Water and power to the working area are shut off at the valves and breakers the shutoff map names. Anything that stays in service, like a refrigerator on a temporary circuit, is labeled so nobody cuts it by accident.

About full home remodelingRemodeling in Tarzana

Full Home Remodeling in Tarzana: questions to settle first

Start your full home remodeling plan in Tarzana