Marina del Rey Kitchen Remodeling, Below the Floor

Marina del Rey kitchen remodels that check what runs under a concrete slab before the sink moves, with cabinets, venting and power planned first.

Tell us about the kitchen

By sending, you agree Navon Home may contact you by call or email about your request. Consent isn't required to buy. Privacy Policy

If the kitchen sits on a concrete slab, its drain and supply lines may run underneath, and a sink that moves across the room means cutting the floor. In Marina del Rey that single fact can change the whole layout. Kitchen Remodeling starts by working out what is under the finish floor, since the cost of a move depends on it.

Slab cuts and trenches

Relocating a drain through a slab calls for a saw cut, a trench, new pipe set at the right slope, and a patch of concrete that matches the surrounding floor level. Dust control and a day or two of noise come with it. If the home is a condo or townhouse, the building may also have rules about hours and noise. We check these before the plan is final, so the sink move is a choice with its price attached. A scan or a small test hole can show whether pipes sit in the slab before any cut is made.

Options that avoid the slab

Often a layout can keep the sink where its drain already sits and still improve the room. The range, refrigerator and an added island can all shift without touching the main plumbing. An island sink, by contrast, needs its own drain and vent, which is the costly route. We draw both versions, keep the plumbing in place in one, and price them side by side so the trade is clear. The cheaper version often costs nothing in function, and the other buys a layout that was not otherwise possible.

About kitchen remodelingRemodeling in Marina del Rey

Kitchen Remodeling in Marina del Rey: questions to settle first

Start your kitchen remodeling plan in Marina del Rey

Describe the space and the change you want. We reply with what the first visit covers.